A²/O Process Instrument Replacement at Hangzhou Qige WWTP

Hangzhou, Zhejiang, China 2019 Municipal WWTP
A²/O Process Instrument Replacement at Hangzhou Qige WWTP — project photo 11 / 2

Project Background

A²/O process instrument replacement at a 1.2 million t/day plant.

Customer Challenge

This 1.2 million tons/day A²/O plant must meet national Class 1B. Built with imported instruments, procurement and O&M costs were high. Large biological processes depend strongly on suspended-solids, DO, pH and ORP monitoring, so reliable process instruments were needed to replace imports with domestic equivalents.

The TENGINE Solution

MLSS suspended-solids meter, LDO optical dissolved oxygen meter, pH meter, ORP meter.

Implementation

MLSS Suspended Solids (Sludge) Concentration Analyzer, LDO Luminescent Dissolved Oxygen Analyzer, TPH pH Analyzer, TORP ORP Analyzer.

Project Results

Import substitution at a super-large municipal plant cut procurement and O&M costs. Instruments have run stably for nearly five and a half years, proving domestic reliability at a million-ton scale and keeping 1.2 million tons/day at Class 1B — a practical reference for domestic instrument upgrades.

Full-Process Water Quality Monitoring for Daqing High-Tech Zone WWTP
Daqing, Heilongjiang, China · 2023
WWTP Process ControlWastewater Treatment Process

The plant handles a large daily flow through a complex multi-stage process, requiring precise control of influent/effluent quality and process status. Water quality data must also feed the environmental regulator's system, but legacy single-parameter instruments with lagging data could not support full-process control or compliant reporting.

13-Year Stable Operation at Zhenjiashan Wastewater Treatment Plant
Zhongshan, Guangdong, China · 2011
WWTP Process ControlWastewater Treatment Process

Municipal wastewater plants present complex conditions and fluctuating water quality. Instruments run continuously while submerged, so conventional meters age, drift and fail — driving up replacement and maintenance costs and conflicting with the need for long-term, low-maintenance operation.

Urban-Rural Integrated Wastewater Treatment PPP Project
Guannan, Jiangsu, China · 2021
Rural & Township WastewaterWastewater Treatment Process

Aging online instruments no longer met current pollution-source monitoring specifications. The project had a tight schedule and complex construction, requiring on-time delivery of a large instrument batch; multiple dispersed sites demanded certified, stable devices connected to a smart-water platform, plus complete installation and commissioning services.