Intelligent Sludge Discharge at Shanghai Bailonggang WWTP

Shanghai, China 2026 Municipal Wastewater Treatment Plant
Intelligent Sludge Discharge at Shanghai Bailonggang WWTP — project photo 11 / 3

Project Background

Operated by Shanghai Chengtou, Bailonggang is one of Asia's largest wastewater treatment plants. At this scale, sludge discharge is a daily process decision with direct consequences for effluent quality and operating cost.

Customer Challenge

Sludge concentration and blanket-level measurement were unreliable, so discharge relied on operator experience. Timing and volume were hard to control precisely — under-discharge, over-discharge and sludge loss all occurred, destabilizing effluent quality and pushing up running costs.

The TENGINE Solution

TENGINE installed the USL ultrasonic sludge level analyzer with the TC1000 classic controller, giving the plant real-time measurement of sludge concentration and the mud-water blanket level as a firm data basis for discharge control.

Implementation

USL sludge level analyzers were installed at the sludge discharge points and connected to the TC1000 controller, providing continuous real-time blanket data to the operators.

Project Results

Discharge timing and volume are now controlled on accurate data instead of guesswork: manual inspection rounds and experience-based discharge are reduced, discharge efficiency is up, effluent quality stays stable, and the plant's running costs are down.

Oil-in-Water Monitoring for Saudi Arabia's Red Sea New City
Saudi Arabia · 2022
WWTP Process ControlWastewater Treatment Process

A mega-project of this scale places extreme demands on water quality data — accuracy and stability must hold over decades of operation. The wastewater treatment works required continuous online monitoring of oil content in water: a demanding measurement that has to run unattended in a harsh coastal desert environment, resist fouling, and integrate cleanly into plant process control.

Precision Monitoring for Membrane Pilot Testing at Nanjing Beihekou Plant
Nanjing, Jiangsu, China · 2026
Pilot & R&D MonitoringWastewater Treatment Process

Membrane performance calibration demands precise, time-aligned and traceable water-quality data to verify retention, anti-fouling and cleaning-recovery behavior. The pain points were acute: micro-leakage is hard to detect, and instrument drift under variable operating conditions contaminates the baseline data that the whole evaluation depends on.

Sludge Blanket Level Monitoring at Guangzhou Datansha WWTP
Guangzhou, Guangdong, China · 2026
WWTP Process ControlWastewater Treatment Process

Accurate sludge-blanket level measurement in the secondary clarifiers is the key to controlling scraper start/stop, saving energy and keeping effluent compliant — but the plant faced the industry's common pain points: strong water disturbance, sludge fouling on probes and a blurry mud-water boundary made the actual blanket thickness hard to determine, while conventional ultrasonic meters were severely disturbed by scum and bubbles, producing drifting data that could not be used as a basis for automatic control.