TENGINE — Tengine Innovation

Process Optimization & Control

A²/O Process Instrument Replacement at Hangzhou Qige WWTP

Hangzhou, Zhejiang, China 2019 Municipal WWTP
A²/O Process Instrument Replacement at Hangzhou Qige WWTP — project photo 11 / 2

Bối cảnh dự án

A²/O process instrument replacement at a 1.2 million t/day plant.

Thách thức của khách hàng

This 1.2 million tons/day A²/O plant must meet national Class 1B. Built with imported instruments, procurement and O&M costs were high. Large biological processes depend strongly on suspended-solids, DO, pH and ORP monitoring, so reliable process instruments were needed to replace imports with domestic equivalents.

Giải pháp của TENGINE

MLSS suspended-solids meter, LDO optical dissolved oxygen meter, pH meter, ORP meter.

Triển khai thực hiện

MLSS Suspended Solids (Sludge) Concentration Analyzer, LDO Luminescent Dissolved Oxygen Analyzer, TPH pH Analyzer, TORP ORP Analyzer.

Kết quả dự án

Import substitution at a super-large municipal plant cut procurement and O&M costs. Instruments have run stably for nearly five and a half years, proving domestic reliability at a million-ton scale and keeping 1.2 million tons/day at Class 1B — a practical reference for domestic instrument upgrades.

Full-Process Water Quality Monitoring for Daqing High-Tech Zone WWTP
Daqing, Heilongjiang, China · 2023
WWTP Process ControlQuy trình xử lý nước thải

The plant handles a large daily flow through a complex multi-stage process, requiring precise control of influent/effluent quality and process status. Water quality data must also feed the environmental regulator's system, but legacy single-parameter instruments with lagging data could not support full-process control or compliant reporting.

13-Year Stable Operation at Zhenjiashan Wastewater Treatment Plant
Zhongshan, Guangdong, China · 2011
WWTP Process ControlQuy trình xử lý nước thải

Municipal wastewater plants present complex conditions and fluctuating water quality. Instruments run continuously while submerged, so conventional meters age, drift and fail — driving up replacement and maintenance costs and conflicting with the need for long-term, low-maintenance operation.

Urban-Rural Integrated Wastewater Treatment PPP Project
Guannan, Jiangsu, China · 2021
Rural & Township WastewaterQuy trình xử lý nước thải

Aging online instruments no longer met current pollution-source monitoring specifications. The project had a tight schedule and complex construction, requiring on-time delivery of a large instrument batch; multiple dispersed sites demanded certified, stable devices connected to a smart-water platform, plus complete installation and commissioning services.

Đang gặp thách thức giám sát tương tự?

Hãy cho chúng tôi biết ứng dụng của bạn — kỹ sư của chúng tôi sẽ tham chiếu kinh nghiệm dự án này và thiết kế giải pháp cho hiện trường của bạn.