Bối cảnh dự án

Long-term process monitoring at a municipal wastewater treatment plant.

Thách thức của khách hàng

Municipal wastewater plants present complex conditions and fluctuating water quality. Instruments run continuously while submerged, so conventional meters age, drift and fail — driving up replacement and maintenance costs and conflicting with the need for long-term, low-maintenance operation.

Giải pháp của TENGINE

Sludge concentration meters, ultrasonic level meters and other process instruments engineered for durability were installed.

Triển khai thực hiện

HSS Sludge Concentration Analyzer, TUL Ultrasonic Level Transmitter.

Kết quả dự án

The instruments have run stably for 13 years, sharply cutting replacement and labor costs while continuously providing accurate data for process control and compliance — fully validating the durability and reliability of TENGINE wastewater monitoring equipment.

Full-Process Water Quality Monitoring for Daqing High-Tech Zone WWTP
Daqing, Heilongjiang, China · 2023
WWTP Process ControlQuy trình xử lý nước thải

The plant handles a large daily flow through a complex multi-stage process, requiring precise control of influent/effluent quality and process status. Water quality data must also feed the environmental regulator's system, but legacy single-parameter instruments with lagging data could not support full-process control or compliant reporting.

Urban-Rural Integrated Wastewater Treatment PPP Project
Guannan, Jiangsu, China · 2021
Rural & Township WastewaterQuy trình xử lý nước thải

Aging online instruments no longer met current pollution-source monitoring specifications. The project had a tight schedule and complex construction, requiring on-time delivery of a large instrument batch; multiple dispersed sites demanded certified, stable devices connected to a smart-water platform, plus complete installation and commissioning services.

Guangzhou Datansha Wastewater Treatment Plant Project
Guangzhou, Guangdong, China · 2023
WWTP Process ControlQuy trình xử lý nước thải

This benchmark South China plant treats 550,000 tons/day. Secondary-clarifier sludge level is critical to scraper control, effluent compliance and energy saving — but turbulent water, sludge adhesion and complex sludge-water interfaces make measurement hard. Conventional ultrasonic interface meters suffer from scum and bubbles, producing unreliable data that cannot drive automated scraper control.