TENGINE — Tengine Innovation

WWTP Process Control

Guangzhou Datansha Wastewater Treatment Plant Project

Guangzhou, Guangdong, China 2023 Municipal WWTP
Guangzhou Datansha Wastewater Treatment Plant Project — project photo 11 / 2

Bối cảnh dự án

Secondary-clarifier sludge-blanket monitoring at a 550,000 t/day benchmark plant.

Thách thức của khách hàng

This benchmark South China plant treats 550,000 tons/day. Secondary-clarifier sludge level is critical to scraper control, effluent compliance and energy saving — but turbulent water, sludge adhesion and complex sludge-water interfaces make measurement hard. Conventional ultrasonic interface meters suffer from scum and bubbles, producing unreliable data that cannot drive automated scraper control.

Giải pháp của TENGINE

A USL intelligent sludge-blanket level meter was installed.

Triển khai thực hiện

USL Ultrasonic Sludge Level Analyzer.

Kết quả dự án

Accurate, stable level data now drives smart scraper control, eliminating idle running and saving energy. The self-cleaning design drastically reduces maintenance, solved the industry's secondary-clarifier interface challenge, and proved domestic interface meters in large municipal plants.

Full-Process Water Quality Monitoring for Daqing High-Tech Zone WWTP
Daqing, Heilongjiang, China · 2023
WWTP Process ControlQuy trình xử lý nước thải

The plant handles a large daily flow through a complex multi-stage process, requiring precise control of influent/effluent quality and process status. Water quality data must also feed the environmental regulator's system, but legacy single-parameter instruments with lagging data could not support full-process control or compliant reporting.

13-Year Stable Operation at Zhenjiashan Wastewater Treatment Plant
Zhongshan, Guangdong, China · 2011
WWTP Process ControlQuy trình xử lý nước thải

Municipal wastewater plants present complex conditions and fluctuating water quality. Instruments run continuously while submerged, so conventional meters age, drift and fail — driving up replacement and maintenance costs and conflicting with the need for long-term, low-maintenance operation.

Urban-Rural Integrated Wastewater Treatment PPP Project
Guannan, Jiangsu, China · 2021
Rural & Township WastewaterQuy trình xử lý nước thải

Aging online instruments no longer met current pollution-source monitoring specifications. The project had a tight schedule and complex construction, requiring on-time delivery of a large instrument batch; multiple dispersed sites demanded certified, stable devices connected to a smart-water platform, plus complete installation and commissioning services.

Đang gặp thách thức giám sát tương tự?

Hãy cho chúng tôi biết ứng dụng của bạn — kỹ sư của chúng tôi sẽ tham chiếu kinh nghiệm dự án này và thiết kế giải pháp cho hiện trường của bạn.