1 / 4Project Background
A newly built industrial-park wastewater plant in Yantai — designed for 80,000 m³/day with a 10,000 m³/day first phase — collects effluent from enterprises across the park, with complex water chemistry and many treatment stages that made monitoring design critical from day one.
Customer Challenge
A greenfield plant needs its monitoring right the first time: precise, stable instruments across biological tanks, lift pump houses and blower rooms; dependable commissioning on a tight schedule; and after-sales support that keeps a new operation team confident.
The TENGINE Solution
TENGINE supplied 43 process analysis instruments — suspended-solids meters, dissolved oxygen analyzers, UVN nitrate analyzers and more — selected stage by stage for the plant's biological tanks, lift pump houses and blower rooms. Installation started in August 2023 and full commissioning and acceptance were completed in September, backed by a two-year warranty, annual inspections, and full maintenance and parts service.
Implementation
Forty-three instruments were installed across the key process stages in August–September 2023, passing full commissioning acceptance within two months.
Project Results
The new plant achieved industrial-grade online monitoring from day one: process data across all stages supports treatment optimization and pollutant reduction, industrial wastewater stays compliant, and the full-lifecycle service system keeps the young operation team running confidently — supporting water reuse and the park's green development.
Related Case Studies

The mill had long relied on imported instrument brands: procurement, system deployment and O&M costs were all high, and a mixed-brand fleet brought poor compatibility, fragmented after-sales and inefficient maintenance. It needed a single accountable supplier without giving up measurement performance.

Tofu production is water-intensive, and process water can carry contaminants such as heavy metals and organic pollutants. Without continuous monitoring, quality risks to the product — and health risks to consumers — can go undetected. At the same time, improperly managed wastewater discharge harms the environment and exposes the company to regulatory violations and legal liability.

The mixed industrial influent is complex and swings hard; the AAO process demands close tracking of DO, sludge concentration and quality parameters; and with monitoring points spread across the whole plant, a single instrument type could never fit every location. Data lag or loss directly threatens process stability and effluent compliance.
Facing a similar monitoring challenge?
Tell us about your application — our engineers will reference this project experience and design a solution for your site.