1 / 3Project Background
A 100,000 m³/d wastewater plant in Dalian operated by Beijing Capital treats predominantly industrial wastewater and must meet the strict Class 1A discharge standard.
Customer Challenge
Industrial-dominated influent swings wildly and carries high concentrations of pollutants and interfering ions. Manual lab data lagged hours behind the process, preventing timely carbon-dosing optimization and putting effluent compliance at risk.
The TENGINE Solution
TENGINE deployed TEM online COD and nitrogen analyzers with sampling pretreatment, sized for the plant's full range — the pretreatment stage shields the measurement from the complex industrial matrix.
Implementation
Analyzers with sampling pretreatment were installed at the anoxic-zone monitoring points, delivering stable readings despite the aggressive industrial water chemistry.
Project Results
Sampling pretreatment effectively resists industrial-water interference, keeping measurement stable. Online real-time data has replaced manual lab work, carbon dosing is optimized, and Class 1A effluent is secured.
Related Case Studies

A mega-project of this scale places extreme demands on water quality data  accuracy and stability must hold over decades of operation. The wastewater treatment works required continuous online monitoring of oil content in water: a demanding measurement that has to run unattended in a harsh coastal desert environment, resist fouling, and integrate cleanly into plant process control.

Membrane performance calibration demands precise, time-aligned and traceable water-quality data to verify retention, anti-fouling and cleaning-recovery behavior. The pain points were acute: micro-leakage is hard to detect, and instrument drift under variable operating conditions contaminates the baseline data that the whole evaluation depends on.

Sludge concentration and blanket-level measurement were unreliable, so discharge relied on operator experience. Timing and volume were hard to control precisely — under-discharge, over-discharge and sludge loss all occurred, destabilizing effluent quality and pushing up running costs.