Nitrate Monitoring in the Anoxic Zone at a Dalian Plant

Dalian, Liaoning, China 2023 Municipal WWTP
Nitrate Monitoring in the Anoxic Zone at a Dalian Plant — project photo 11 / 3

Bối cảnh dự án

Anoxic-zone nitrate monitoring at an industrial-dominated WWTP.

Thách thức của khách hàng

This 100,000 m³/d plant must meet Class 1A. Its influent is mainly industrial wastewater with large swings and high-concentration pollutant and ion interference. Manual lab data lagged, preventing timely carbon-dosing optimization and risking non-compliant effluent.

Giải pháp của TENGINE

A large-scale, full-range instrument package with sampling pretreatment was deployed.

Triển khai thực hiện

TEM COD / Nitrogen Analyzers with Sampling Pretreatment.

Kết quả dự án

Sampling pretreatment effectively resists complex industrial-water interference, keeping measurement stable. Online real-time data replaces manual lab work, optimizes carbon dosing, and secures stable Class 1A effluent.

Full-Process Water Quality Monitoring for Daqing High-Tech Zone WWTP
Daqing, Heilongjiang, China · 2023
WWTP Process ControlQuy trình xử lý nước thải

The plant handles a large daily flow through a complex multi-stage process, requiring precise control of influent/effluent quality and process status. Water quality data must also feed the environmental regulator's system, but legacy single-parameter instruments with lagging data could not support full-process control or compliant reporting.

13-Year Stable Operation at Zhenjiashan Wastewater Treatment Plant
Zhongshan, Guangdong, China · 2011
WWTP Process ControlQuy trình xử lý nước thải

Municipal wastewater plants present complex conditions and fluctuating water quality. Instruments run continuously while submerged, so conventional meters age, drift and fail — driving up replacement and maintenance costs and conflicting with the need for long-term, low-maintenance operation.

Urban-Rural Integrated Wastewater Treatment PPP Project
Guannan, Jiangsu, China · 2021
Rural & Township WastewaterQuy trình xử lý nước thải

Aging online instruments no longer met current pollution-source monitoring specifications. The project had a tight schedule and complex construction, requiring on-time delivery of a large instrument batch; multiple dispersed sites demanded certified, stable devices connected to a smart-water platform, plus complete installation and commissioning services.

Đang gặp thách thức giám sát tương tự?

Hãy cho chúng tôi biết ứng dụng của bạn — kỹ sư của chúng tôi sẽ tham chiếu kinh nghiệm dự án này và thiết kế giải pháp cho hiện trường của bạn.