Bối cảnh dự án

Advanced denitrification-filter monitoring at a municipal WWTP.

Thách thức của khách hàng

The plant uses advanced denitrification and must track influent nitrate at the denitrification filter in real time, recording full-process data to guide adjustment and control effluent total nitrogen.

Giải pháp của TENGINE

A UV nitrate analyzer and intelligent controller were installed.

Triển khai thực hiện

UVN Nitrate Nitrogen Analyzer, TC2000 Multi-Parameter Intelligent Controller.

Kết quả dự án

Continuous online monitoring of denitrification-filter influent nitrate preserves complete process data; reliable measurement supports advanced denitrification control and stable effluent total-nitrogen compliance.

Full-Process Water Quality Monitoring for Daqing High-Tech Zone WWTP
Daqing, Heilongjiang, China · 2023
WWTP Process ControlQuy trình xử lý nước thải

The plant handles a large daily flow through a complex multi-stage process, requiring precise control of influent/effluent quality and process status. Water quality data must also feed the environmental regulator's system, but legacy single-parameter instruments with lagging data could not support full-process control or compliant reporting.

13-Year Stable Operation at Zhenjiashan Wastewater Treatment Plant
Zhongshan, Guangdong, China · 2011
WWTP Process ControlQuy trình xử lý nước thải

Municipal wastewater plants present complex conditions and fluctuating water quality. Instruments run continuously while submerged, so conventional meters age, drift and fail — driving up replacement and maintenance costs and conflicting with the need for long-term, low-maintenance operation.

Urban-Rural Integrated Wastewater Treatment PPP Project
Guannan, Jiangsu, China · 2021
Rural & Township WastewaterQuy trình xử lý nước thải

Aging online instruments no longer met current pollution-source monitoring specifications. The project had a tight schedule and complex construction, requiring on-time delivery of a large instrument batch; multiple dispersed sites demanded certified, stable devices connected to a smart-water platform, plus complete installation and commissioning services.