TENGINE — Tengine Innovation

Stormwater & Outfall Monitoring

Sub-Control Monitoring of Flood-Intercept Channels

Xiong'an, Hebei, China 2023 New-Area Authority
Sub-Control Monitoring of Flood-Intercept Channels — project photo 11 / 3

Bối cảnh dự án

Sub-control monitoring of flood-intercept channels in Xiong'an.

Thách thức của khách hàng

Xiong'an New Area's flood-intercept channels require sub-control monitoring to manage stormwater and protect the new city's water environment.

Giải pháp của TENGINE

Sub-control monitoring of flood-intercept channels.

Triển khai thực hiện

Channel Monitoring Station.

Kết quả dự án

Monitoring now supports refined stormwater control across Xiong'an's flood-intercept system, contributing to the new area's resilient water management.

Full-Process Water Quality Monitoring for Daqing High-Tech Zone WWTP
Daqing, Heilongjiang, China · 2023
WWTP Process ControlQuy trình xử lý nước thải

The plant handles a large daily flow through a complex multi-stage process, requiring precise control of influent/effluent quality and process status. Water quality data must also feed the environmental regulator's system, but legacy single-parameter instruments with lagging data could not support full-process control or compliant reporting.

13-Year Stable Operation at Zhenjiashan Wastewater Treatment Plant
Zhongshan, Guangdong, China · 2011
WWTP Process ControlQuy trình xử lý nước thải

Municipal wastewater plants present complex conditions and fluctuating water quality. Instruments run continuously while submerged, so conventional meters age, drift and fail — driving up replacement and maintenance costs and conflicting with the need for long-term, low-maintenance operation.

Urban-Rural Integrated Wastewater Treatment PPP Project
Guannan, Jiangsu, China · 2021
Rural & Township WastewaterQuy trình xử lý nước thải

Aging online instruments no longer met current pollution-source monitoring specifications. The project had a tight schedule and complex construction, requiring on-time delivery of a large instrument batch; multiple dispersed sites demanded certified, stable devices connected to a smart-water platform, plus complete installation and commissioning services.

Đang gặp thách thức giám sát tương tự?

Hãy cho chúng tôi biết ứng dụng của bạn — kỹ sư của chúng tôi sẽ tham chiếu kinh nghiệm dự án này và thiết kế giải pháp cho hiện trường của bạn.