TENGINE — Tengine Innovation

Extreme Climate Operation

Instrumentation for Extreme-Climate Operation at Jinghe WWTP

Jinghe, Xinjiang, China 2022 Municipal WWTP
Instrumentation for Extreme-Climate Operation at Jinghe WWTP — project photo 11 / 2

Bối cảnh dự án

Extreme-climate (cold & heat) monitoring at a 15,000 t/day A²/O plant.

Thách thức của khách hàng

Located in northwest Xinjiang with extreme day-night temperature swings, the site demands high weather resistance. The 15,000 tons/day A²/O plant must meet Class 1A, with biological, effluent and open-channel stages requiring many coordinated instrument types under harsh conditions and minimal maintenance.

Giải pháp của TENGINE

COD online analyzer, dissolved oxygen meter, sludge concentration meter, turbidimeter, pH meter, sludge-blanket level meter, ultrasonic level & level-difference meters, electromagnetic flowmeter, open-channel flowmeter, thermal gas mass flowmeter.

Triển khai thực hiện

UVC Integrated Online COD Sensor, LDO Luminescent Dissolved Oxygen Analyzer, HSS Sludge Concentration Analyzer, MTU High-Precision Turbidity Analyzer, TPH pH Analyzer, USL Ultrasonic Sludge Level Analyzer, TUF Ultrasonic Open-Channel Flowmeter.

Kết quả dự án

Proven adaptability to the northwest's extreme cold-and-heat climate, with instruments stable for nearly three years. The 15,000 tons/day plant meets Class 1A consistently — a mature reference for instrument packages in high-temperature-swing municipal wastewater projects.

Full-Process Water Quality Monitoring for Daqing High-Tech Zone WWTP
Daqing, Heilongjiang, China · 2023
WWTP Process ControlQuy trình xử lý nước thải

The plant handles a large daily flow through a complex multi-stage process, requiring precise control of influent/effluent quality and process status. Water quality data must also feed the environmental regulator's system, but legacy single-parameter instruments with lagging data could not support full-process control or compliant reporting.

13-Year Stable Operation at Zhenjiashan Wastewater Treatment Plant
Zhongshan, Guangdong, China · 2011
WWTP Process ControlQuy trình xử lý nước thải

Municipal wastewater plants present complex conditions and fluctuating water quality. Instruments run continuously while submerged, so conventional meters age, drift and fail — driving up replacement and maintenance costs and conflicting with the need for long-term, low-maintenance operation.

Urban-Rural Integrated Wastewater Treatment PPP Project
Guannan, Jiangsu, China · 2021
Rural & Township WastewaterQuy trình xử lý nước thải

Aging online instruments no longer met current pollution-source monitoring specifications. The project had a tight schedule and complex construction, requiring on-time delivery of a large instrument batch; multiple dispersed sites demanded certified, stable devices connected to a smart-water platform, plus complete installation and commissioning services.